Skip to content
AI Marketplaces Leaderboard

Ganttly Project Timeline

Claude connectorCommunity

Build Gantt charts and project timelines with the critical path, float, and milestones on business days, and test how task slips move the f…

View in Claude directory

Ganttly Project Timeline builds a project schedule and Gantt chart from a task list using the critical path method (CPM). It is used by project managers, team leads, consultants, and students planning a thesis.

List tasks with durations, dependencies, and a start date. Ganttly returns early start, early finish, late start, late finish, and total float for each task, the critical path, milestones, and the project end date.

Calendars: plan on business days that skip weekends and the public holidays of a chosen country (with regional holidays, local weekends such as Friday-Saturday, and your own days off such as a year-end shutdown), or on plain calendar days. Durations can be given in days or weeks. Dependencies are finish-to-start and can carry a lag ("Design+2") or a lead ("Build-3"). Tasks can have a start-no-earlier-than date, an owner, or be zero-length milestones.

The interactive chart has a day and week axis, task bars, dependency arrows, the critical path in red, float after each bar, milestone diamonds, and a today line. Tap a task for its dates and float, and test a slip to see the new end date and critical path.

What-if analysis compares up to four scenarios against the plan, for example how far a 5-day slip moves the finish and which tasks become critical.

Downloads: a CSV schedule, an .ics calendar file with milestones and task start dates, and an SVG image of the chart for slides and documents.

The schedule is computed by deterministic code, so the same inputs give the same dates. Dependency loops and unknown task names are explained in plain language.

Example: "Make a Gantt chart starting 2026-11-02: Design 5 days; Build 10 days after Design; Test 4 days after Build; Docs 3 days after Design; Launch milestone after Test and Docs."

Limitations: finish-to-start links only (no start-to-start or finish-to-finish), whole-day scheduling, and no resource levelling, costs, or progress tracking. Plans are not saved or synced with project tools.

Tools
2

exposed by this connector

Movement

From our daily snapshots over the last 30 days.

Rank by popularity

#3596of 7,29427places down24h423places up7d
#3,403#3,904#4,405#4,906Sep 27Oct 3Oct 9Oct 15Oct 21Oct 26

Rank by trending score

—not ranked—24h—7d
—

Popularity score

5,492+3324h+1,4057d
1,1952,3683,5414,714Sep 27Oct 3Oct 9Oct 15Oct 21Oct 26

Trending score

——24h—7d
—

In its category

How this connector compares with others in the same category. Positions are counted within the category, not across the whole directory.

Productivity1,903rd of 4,005 by popularity · not ranked by trending score
Order by

All 4,049 Productivity connectors

Also on other marketplaces

More from Zovo

All listings by Zovo

6 more on the publisher’s page.

Tools

  • compare_timeline_scenarios
  • plan_project_timeline
Categories
Made by
Zovo · Website
Sign-in
Not required
Connector URL
https://gantt-timeline.zovo.one/mcp
Transport
Streamable HTTP
Works with
Claude, Claude API, Claude Code, Claude Desktop
Added
October 3, 2026
More info
Sponsorship
Promote this connector